Single Interface Power Control

In the CC-SG Admin Client, you can select the power operation you want to perform on a specific power control interface using the interface's right-click menu.

  1. In the Nodes tab, right-click the power control interface, and then click the power operation you want to perform. The Power Control screen opens.
  2. The selected interface name displays in the Selected list. The power operation you selected on the right-click menu is populated in the Operation field.
  3. Click OK to send the power operation request to the node. A confirmation message appears in the screen.
  4. A Power Status Messages window opens to show you the status of the power control operation. Messages populate the window as new information is received about the power control operation. Keep this window open until all power control operations are complete, so that you can monitor progress.
  5. See Power Status Messages for details on how CC-SG alerts you to successful and failed power control operations.

See Also

Power Control for Nodes Using the Admin Client

Single Node Power Control

Node Group Power Control